MEDBRUSfor Manufacturing

An example for a manufacturing business.

Seven manual jobs at a manufacturer, and how each could be automated.

Each example shows a manual job after the tools are connected, with how it works before beside it. On a phone, swipe to see before.

01Ingredient quotes

After

Quotes side by side, at real cost

One request goes out, and every answer is compared on what it really costs landed, with minimum orders and freight counted.

  • One request goes to every supplier
  • Replies compared on landed cost per kg
  • Cheapest and fastest marked
After
Quote comparison80 kg ashwagandha root extract · sent once to 4 suppliers
Dusk Harbour SupplyEx works, freight added · min 50 kg · 21 days €41.20per kg landed Lowest cost
Norvell IngredientsEx works, freight added · min 25 kg · 10 days €42.70per kg landed
Corvane Mineral Co.Delivered · min 20 kg · 7 days €43.20per kg landed Fastest
Pellam BotanicalsDelivered · min 100 kg · 14 days €49.88per kg landed Buys 100 kg for 80

Worth a lookPellam looks cheaper than Norvell at €39.90 per kg, but the 100 kg minimum makes it €49.88 per kg for the 80 kg needed.

Last paid €42.10 per kg (Norvell Ingredients, 3 months ago).

Illustration. An example business, not a real company.

Before

Quotes come back in four formats

The same request goes to several suppliers, and the answers arrive as emails, PDFs and phone notes, each with different terms.

  • The same request is emailed to each supplier
  • Every reply is retyped into a sheet
  • Freight and minimum orders are worked out by hand
Before
Email · sent

To: 4 suppliers

Please quote 80 kg ashwagandha root extract, 5% withanolides, delivered if possible.

Email · reply

Norvell Ingredients

41,50 EUR per kg ex works. MOQ 25 kg. Ready in about 10 days.

PDF quote

Pellam Botanicals

Unit price39.90 / kg

Minimum order100 kg

Valid14 days

Phone note

Dusk Harbour 37.80 ex works? freight extra call back Thu

Tomas retypes four formats into a sheet

Illustration. An example business, not a real company.

02Production planning

After

A plan that checks itself

The board orders each line by allergen and due date, counts the cleaning, and flags anything that would run late.

  • Jobs ordered by allergen and due date
  • Cleaning time counted into the plan
  • Anything at risk flagged before it runs
After
Production boardThree lines · next three days
Mon 2 NovTue 3 NovWed 4 Nov
ACapsulesMagnesium9 hAshwagandha14 hTurmeric8 h
BTabletsVitamin D310 hZinc + C8 h
CPowders and sachetsHydration5 hGreens6 hCollagen7 h

CleaningAllergen job

Line A: Ashwagandha was 1 h past its due time. Reordered by due date, it now finishes on time.

Line C: Collagen (fish allergen) now runs last, so the deep clean in the middle of the run goes. 3 h saved.

Illustration. An example business, not a real company.

Before

The production plan lives on a whiteboard

Jobs are planned line by line in the order they came in, and it's redone every morning when something changes.

  • The plan is redrawn each morning
  • Cleaning time is guessed
  • Late jobs are found when they're late
Before
Whiteboard

A: Magnesium, Turmeric, Ashwagandha B: Vitamin D3, Zinc + C C: Collagen, Hydration, Greens

Plan spreadsheet
ABC
1LineFirstThen
2AMagnesiumTurmeric late?
3BVitamin D3Zinc + C
4CCollagenHydration clean 4h

rush order for Zinc chews?? ask Lena

Ivana redoes the plan every morning

Illustration. An example business, not a real company.

03Materials and packaging

After

Shortages seen before they bite

Needs come straight from the schedule, so every shortage shows when to order it, given the supplier's lead time.

  • Needs worked out from the schedule
  • Stock on hand checked automatically
  • Order-by dates from each supplier's lead time
After
Materials neededWorked out from the production schedule
Amber glass bottlesShort by 7 thousand on Wed 11 Nov · suggest 10 · 10 days to arrive Past order-by
Sachet filmShort by 10 rolls on Wed 4 Nov · suggest 12 · 2 days to arrive Order today
Turmeric extractShort by 22 kg on Tue 17 Nov · suggest 25 · 10 days to arrive Order by Tue
Magnesium glycinate62 kg needed · 70 on hand Enough
Vitamin D3 powder12 kg needed · 15 on hand Enough
Zinc citrate28 kg needed · 40 on hand Enough
Plant capsule shells345 thousand needed · 380 on hand Enough

Draft purchase orders ready. Sent when someone approves them.

Illustration. An example business, not a real company.

Before

Materials are worked out in Excel

Someone turns the plan into ingredient and packaging needs by hand, then checks stock and lead times from memory.

  • Needs calculated recipe by recipe
  • Stock found by asking the warehouse
  • Lead times remembered, or not
Before
Recipe maths
ABC
1MaterialNeedsStock
2Magnesium6270
3Turmeric41+4160
4Film8+1412?
5Bottles6+9+1220
Chat

Tomas

Do we have enough film for Wednesday?

Piotr

Counted 12 rolls yesterday, but 8 are spoken for?

bottles: check lead time!!

Tomas works out the needs from the plan

Illustration. An example business, not a real company.

04Shop-floor reporting

After

Counts entered once, at the line

A tablet at the line takes the counts as they happen, and the office sees progress, yield and finishing time live.

  • Counts entered on a tablet at the line
  • Rejects and stops logged with a reason
  • Live progress, yield and finishing time
After
Line A · B-223614:20

Magnesium glycinate capsules

47,520good of 66,000

98 %yield

980rejected

17:08finishes

Weight check 640Split capsules 340

Add countRejectStop
Live from the floorWhat the office sees
A Magnesium glycinate capsules72 % · finishes 17:08 Running
B Vitamin D3 tablets39 % · finishes 21:41 Running
C Electrolyte powderStarts after cleaning Cleaning

Illustration. An example business, not a real company.

Before

Counts on paper, typed up later

Output and rejects are written on paper or sent in chats, and a supervisor types them up after the shift.

  • Counts tallied on paper
  • Rejects and stops reported in chat
  • Typed up once the shift is over
Before
Paper tally

Line A · B-2236 about 48k good rejects 1000? stopped 12 + 8 min

Shift chat

Line A done soon? How many cases?

About 260, plus a box of rework?

End-of-shift sheet
ABC
1BatchGoodRejects
2B-2236later
3B-2237
Lena types it all up after the shift

Illustration. An example business, not a real company.

05Batch records and lot tracing

After

From one lot to every shipment

Every batch records the lots it used, so a flagged lot leads straight to the batches and shipments it reached.

  • Each batch records its ingredient lots
  • A flagged lot leads to its batches
  • And from there to every shipment
After
Ingredient lotZN-5521

Zinc citrate

Corvane Mineral Co.
Received 22 Sep

Flagged by supplier
Made into2 batches
B-2204 · Zinc and vitamin C chewablesMade 29 Sep · 3 lots
B-2211 · Daily multi capsulesMade 12 Oct · 3 lots
Shipped to3 shipments
Brivane · 13,500S-7101 · sent 5 Oct
Brivane · 9,500S-7118 · sent 13 Oct
Ostrel · 16,500S-7136 · sent 18 Oct

39,500 units2 batches, 3 shipments, 2 brands. A hold notice for each brand is drafted and waits for approval.

Illustration. An example business, not a real company.

Before

A recall question takes half a day

When a supplier flags a lot, finding what it went into means paper batch sheets, delivery notes and a lot spreadsheet.

  • Batch sheets leafed through by hand
  • Delivery notes matched to lots
  • Shipments traced back from invoices
Before
Batch sheets

B-2204 zinc chews lots: ZN-55?1, VC-33.. B-2211 multi lots: see folder

Delivery notes

DN-2287.pdf

DN-2301.pdf

DN-2310.pdf

scan0042.pdf

Lot sheet
ABC
1LotItemUsed in
2ZN-5521ZincB-2204..?
3VC-3318Vit C
4SW-7710Sweet.?
Email

Corvane Mineral Co.

Lot ZN-5521 is under review. Please check what you made with it.

Noor searches four places for the answer

Illustration. An example business, not a real company.

06Quality release

After

Checked against spec as results arrive

Each result is checked against the specification, every batch shows whether it's ready, waiting or on hold, and the certificate fills itself in.

  • Each result checked against the spec
  • Batch marked ready, waiting or on hold
  • Certificate filled in from the results
After
Batch B-2231Ashwagandha capsules · results against spec
✓ Identity Matches Matches reference
✓ Moisture 4.4 % 5.0 % or less
✓ Lead 0.4 ppm 1.0 ppm or less
✓ Total plate count 90 cfu/g 1,000 or less
✓ Withanolides 5.2 % 5.0 % or more
… Allergen swab Awaiting lab No residue

Certificate of analysis: draft. It fills in when the last result arrives.

Release queueEvery batch waiting on quality
B-2229Ashwagandha capsulesReady to release
B-2231Ashwagandha capsulesWaiting for results
B-2226Ashwagandha capsulesOn hold

Illustration. An example business, not a real company.

Before

Release means chasing documents

Lab results arrive by email in pieces, the checklist is on paper, and the certificate is typed by hand.

  • Lab results collected from email
  • Checked against the spec by eye
  • Certificate typed in Word
Before
Email · lab

Lab results, B-2231

Moisture 4.4, lead 0.4, plate count 90.

Assay to follow, swab next week.

Paper checklist

B-2231 ✓ identity ✓ moisture ? assay ? swab

Certificate (Word)

BatchB-2231

Product

Result

Noor chases results and types the certificate

Illustration. An example business, not a real company.

07Delivery dates

After

A date taken from the live schedule

The date comes from a booked production slot plus quality release, packing and courier time.

  • A production slot found on the line
  • Quality, packing and courier time added
  • A date the customer can rely on
After
Delivery dateMarta · Brivane · 22,500 bottles
  1. ProductionLine B, 8 h slotTue 3 Nov
  2. Quality release2 working daysThu 5 Nov
  3. Pack and label1 working dayFri 6 Nov
  4. Courier2 working daysTue 10 Nov

Earliest delivery: Tue 10 Nov, taken from the live schedule.

To Marta at BrivaneReady to send

Hi Marta, we can deliver the 22,500 bottles by Tue 10 Nov. Production is booked on Line B and the date includes quality release. Thanks, the team

Illustration. An example business, not a real company.

Before

Delivery dates are educated guesses

When a customer asks for a date, the planner checks the schedule, quality and shipping by asking around.

  • The schedule checked by eye
  • Quality and packing times assumed
  • A date promised and hoped for
Before
Email

Marta · Brivane

When could you deliver 22,500 bottles of zinc and vitamin c chewables?

Whiteboard

Line B is full this week? QA 2 days? ask Piotr re cartons

Planning sheet
AB
1LineFree from
2BWed?
3A
4C??
Ivana guesses, then checks with three people

Illustration. An example business, not a real company.

Every business is a little different.

These are examples of how it could work, not a fixed product. A real setup starts from the tools and people a business already has.

Examples of how it could work. Illustrative businesses, not clients. Also: Medbrus for Distribution

Ready to get it all in one place?

Tell me how your business runs today. Together we'll work out how to save you time and keep everything in view.

Let's talk about your business

Call Emil Text Emil on Viber